广州电网黑启动方案

向丽玲 曹亚龙 王珂 张轩

中国电力2011,Vol.44Issue(5):15-18,4.
中国电力2011,Vol.44Issue(5):15-18,4.

广州电网黑启动方案

Black start scheme of Guangzhou Power Grid

向丽玲 1曹亚龙 2王珂 1张轩1

作者信息

  • 1. 广东省电力调度通信中心,广东,广州,510600
  • 2. 广东电网公司,电力科学研究院,广东,广州,510600
  • 折叠

摘要

Abstract

The characteristics of the power plants and the power grid structure should be considered in regional power system black start scheme selection.Based on the statistics of the central and southern Guangzhou Power Grid, the black start sources and routes are studied in detail.Calculation results for problems such as over voltage and inrush current during black start are presented.It is shown that gas turbine generator set should be selected as the black start source plant and the voltage of the generator should be lowered to avoid the switching on over voltage of no load lines and transformers.The high level of the plant electric consumption is preferred to reduce the inrush current effects.The scheme presented here played an important role in power supply scheme for the Guangzhou Asian Games in 2010.

关键词

黑启动/路径/过电压/励磁涌流

分类

信息技术与安全科学

引用本文复制引用

向丽玲,曹亚龙,王珂,张轩..广州电网黑启动方案[J].中国电力,2011,44(5):15-18,4.

中国电力

OA北大核心CSCDCSTPCD

1004-9649

访问量0
|
下载量0
段落导航相关论文