高电压技术2011,Vol.37Issue(3):644-650,7.
特高压GIS特快速暂态过电压试验重复击穿过程研究
Investigation of the VFTO Related Repeated Breakdown Processes in UHV GIS
摘要
Abstract
1100 kV GIS tests were performed to experimentally investigate the circuit on the repeated breakdown process and the VFTO generated when using a disconnector to switch an unload busbar. Since the random feature of the repeated breakdown process, about 500 rounds of opening and closing operations were performed. The break down characteristic of the contact gap during operations, the statistic distribution of the residual voltages at the un load busbar after each opening operation and the statistic distribution of the p. F. Phase of first breakdown in each closing operation were obtained. Based on the test results, the repeated breakdown process and its influence on the VFTO were analyzed, and the conditions for the repeated breakdown process to be terminated were presented.关键词
特高压/气体绝缘组合电器(GIS)/特快速暂态过电压(VFTO)/隔离开关/重复击穿/残余电压Key words
ultra high voltage(UHV)/ gas insulated switchgear(GIS)/ very fast transient overvoltage( VFTO)/ disconnector/ repeated breakdown/ residual voltage分类
信息技术与安全科学引用本文复制引用
刘卫东,汪林森,陈维江,戴敏,李志兵,岳功昌..特高压GIS特快速暂态过电压试验重复击穿过程研究[J].高电压技术,2011,37(3):644-650,7.基金项目
国家重点基础研究发展计划(973计划)(2011209405) (973计划)
国家电网公司科技项目. ()