长江科学院院报2011,Vol.28Issue(4):80-86,7.
三峡工程运用后武汉段河道冲淤变化研究
Erosion-Deposit Variation of the Channel in Wuhan Reach After the Operation of TGP
摘要
Abstract
The completion of the Three Gorges Project has changed the conditions of water and sediment in the downstream channel of the Three Gorges reservoir. Sediment transport capacity of the channel is in an unsaturated state. As a result, riverbed scouring will take place along the river channel, which may bring about adjustment of the Wuhan river regime and may further impact the flood control. In view of this, based on the latest research result of one-dimensional sediment mathematic model, the mathematic model computation along with the observed data analysis is used to conduct preliminary researches on the variation of sediment and the erosion-deposit evolution of the river channel in Wuhan river regime. The research result shows that after a 50-year operation of the Three Gorges Reservoir, there is little change of the river regime and the thalweg of the Wuhan reach. The two branches of Baisha sandbar are kept flowing. However, the left branch of Tianxing sandbar continues to decline, while with the right branch growing.关键词
三峡工程/武汉河段/冲淤Key words
the Three Gorges project/ Wuhan reach/ erosion and deposit分类
建筑与水利引用本文复制引用
崔占峰,张细兵,渠庚..三峡工程运用后武汉段河道冲淤变化研究[J].长江科学院院报,2011,28(4):80-86,7.基金项目
长江科学院院所基金项目-水沙变化与河流系统调整的多维复合模型研究(CKSF2010001) (CKSF2010001)
国家自然科学基金(50879020) (50879020)
水利部公益性行业专项经费项目(200901003) (200901003)