基于网络图的软件项目进度计划编制

任永昌 邢涛 刘大成

吉林大学学报(信息科学版)2011,Vol.29Issue(2):128-134,7.
吉林大学学报(信息科学版)2011,Vol.29Issue(2):128-134,7.

基于网络图的软件项目进度计划编制

Schedule Planning of Software Project Based on Network Chart

任永昌 1邢涛 2刘大成3

作者信息

  • 1. 渤海大学,信息科学与技术学院,辽宁,锦州,121013
  • 2. 北京城市系统工程研究中心,北京,100089
  • 3. 清华大学,工业工程系,北京,100084
  • 折叠

摘要

Abstract

Well-developed, concise and accurate software project schedule planning is the key to successful software development. The current schedule planning mainly uses manual methods, draw up slow, lack of scientific characteristics and so on, the article bases on the network chart, the use of work breakdown structures, program evaluation and review technique, critical path method, gantt chart and other technical studies. It illustrates preparatory work firstly, including the definition of activities, activity sequencing, drawing the network chart, gives time parameters derived formula, including estimation the activity time, estimation the project cycle, calculation activity time, and describes preparation process by examples. The results show that the method of software project scheduling planning has high practical value.

关键词

网络图/软件项目管理/进度计划/关键路径法/甘特图

Key words

network chart/ software project management/ schedule planning/ critical path method/ gantt/chart

分类

信息技术与安全科学

引用本文复制引用

任永昌,邢涛,刘大成..基于网络图的软件项目进度计划编制[J].吉林大学学报(信息科学版),2011,29(2):128-134,7.

基金项目

国家自然科学基金资助项目(70871067) (70871067)

国家863计划基金资助项目(2005AA501560) (2005AA501560)

辽宁省博士基金资助项目(20091034) (20091034)

吉林大学学报(信息科学版)

OACSTPCD

1671-5896

访问量0
|
下载量0
段落导航相关论文