| 注册
首页|期刊导航|水力发电|对水电工程地移民设计管理中几个新理念的探讨

对水电工程地移民设计管理中几个新理念的探讨

彭幼平 龚和平

水力发电2011,Vol.37Issue(4):9-12,4.
水力发电2011,Vol.37Issue(4):9-12,4.

对水电工程地移民设计管理中几个新理念的探讨

Discussion on the New Ideas for Resettlement Design and Management of Hydropower Projects

彭幼平 1龚和平1

作者信息

  • 1. 中国水利水电建设工程咨询公司,北京,100120
  • 折叠

摘要

Abstract

Some new ideas for resettlement planning, design and management of hydropower projects have emerged under current economic and social development in China. The new ideas of Introducing quality factor in the calculation of resettlement compensation, Paying the compensation on an annual basis, Initiating Construction after Finishing Resettlement,Adopting construction agent system and Playing the role of main project design department in resettlement design are analyzed herein. The investigations show that these ideas have certain effectives in actual resettlement planning, design and management.

关键词

征地移民/新理念/水电工程

Key words

resettlement/ new ideas/ hydropower project

分类

社会科学

引用本文复制引用

彭幼平,龚和平..对水电工程地移民设计管理中几个新理念的探讨[J].水力发电,2011,37(4):9-12,4.

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文