The overall and local stabilities of slope are analyzed by finite difference method and block limit equilibrium theory respectively for a hydropower project. The results show that: (i) Local small faults do not pose a greater threat to the overall stability of slope, but some of areas which containing faults should be focused; (ii) The areas of displacement and tensile stress after excavation are smaller and should be reinforced as needed; (iii) In the excavation of the area between El. 430-460 m, the excavation profile may be composed unstable blocks with two sets of structural planes, so the direction and sequence of excavation should be paid attention to; and, (iv) Because two sets of structural planes after excavation are far away from the downstream excavation surface, it is unlikely to form a unstable block, but the drainage should be assured.关键词
边坡/稳定性分析/有限差分法/块体极限平衡理论Key words
slope/ stability analysis/ finite difference method/ block limit equilibrium theory分类
建筑与水利引用本文复制引用
党莉,刘军,刘海飞,卢鹏,陈星..含不利组合结构面的高边坡开挖稳定性分析[J].水力发电,2011,37(4):35-38,4.基金项目
国家自然科学基金(50909052) (50909052)
湖北省自然科学基金计划项目(2008CDB366) (2008CDB366)
峡大学硕士学位论文培优基金资助项目(2010PY018) (2010PY018)