向家坝二期工程施工机械配套优选仿真研究

张孝远 周建中 曹广晶 王毅华 王军周 黎育红

水力发电2011,Vol.37Issue(4):66-69,4.
水力发电2011,Vol.37Issue(4):66-69,4.

向家坝二期工程施工机械配套优选仿真研究

Simulation Study on Concrete Pouring and Construction Equipment Matching Schemes for the Construction of Xiangjiaba Hydropower Station Project in Second Construction Phase

张孝远 1周建中 1曹广晶 2王毅华 2王军周 1黎育红1

作者信息

  • 1. 华中科技大学水电与数字化工程学院,湖北,武汉,430074
  • 2. 中国长江三峡集团公司,湖北,宜昌,443002
  • 折叠

摘要

Abstract

The concrete placement in the second constmction phase of Xiangjiaba Hydropower Station has a higher intensity because of shorter constructing period and larger concrete volume. The dam concrete placement adopts a combination of different construction equipments, and the equipment matching will direct influence construction progress, quality and economic indicators. Different combinations of tower belt machines and shift-type cable machines are simulated from the aspects of construction period, construction strength and utilization rate of equipment. The simulation shows that the matching scheme of taking three tower belt machines and three sets of shift-type cable machine as main means of pouring and supplemented by gate towers is reasonable.

关键词

高混凝土坝/施工机械配套/方案优选/计算机仿真/向家坝水电站

Key words

high concrete dam/ construction equipment matching/ scheme selection/ computer simulation/ Xiangjiaba Hydropower Station

分类

建筑与水利

引用本文复制引用

张孝远,周建中,曹广晶,王毅华,王军周,黎育红..向家坝二期工程施工机械配套优选仿真研究[J].水力发电,2011,37(4):66-69,4.

基金项目

"十一五"国家科技支撑计划重大项目((2008BAB29B05 ) ((2008BAB29B05 )

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文