水力发电2011,Vol.37Issue(4):66-69,4.
向家坝二期工程施工机械配套优选仿真研究
Simulation Study on Concrete Pouring and Construction Equipment Matching Schemes for the Construction of Xiangjiaba Hydropower Station Project in Second Construction Phase
摘要
Abstract
The concrete placement in the second constmction phase of Xiangjiaba Hydropower Station has a higher intensity because of shorter constructing period and larger concrete volume. The dam concrete placement adopts a combination of different construction equipments, and the equipment matching will direct influence construction progress, quality and economic indicators. Different combinations of tower belt machines and shift-type cable machines are simulated from the aspects of construction period, construction strength and utilization rate of equipment. The simulation shows that the matching scheme of taking three tower belt machines and three sets of shift-type cable machine as main means of pouring and supplemented by gate towers is reasonable.关键词
高混凝土坝/施工机械配套/方案优选/计算机仿真/向家坝水电站Key words
high concrete dam/ construction equipment matching/ scheme selection/ computer simulation/ Xiangjiaba Hydropower Station分类
建筑与水利引用本文复制引用
张孝远,周建中,曹广晶,王毅华,王军周,黎育红..向家坝二期工程施工机械配套优选仿真研究[J].水力发电,2011,37(4):66-69,4.基金项目
"十一五"国家科技支撑计划重大项目((2008BAB29B05 ) ((2008BAB29B05 )