| 注册
首页|期刊导航|煤田地质与勘探|低渗煤层注入/压降试井注入时间研究

低渗煤层注入/压降试井注入时间研究

杨新辉 李彬刚 李鑫

煤田地质与勘探2011,Vol.39Issue(2):26-29,4.
煤田地质与勘探2011,Vol.39Issue(2):26-29,4.DOI:10.3969/j.issn.1001-1986.2011.02.006

低渗煤层注入/压降试井注入时间研究

Injection time of injection/fall off test in the low-permeability coal seam

杨新辉 1李彬刚 1李鑫1

作者信息

  • 1. 中国煤炭科工集团西安研究院,陕西,西安,710054
  • 折叠

摘要

Abstract

The purpose is to obtain the rough injection-time range when the radial flow happens during injection/fall-off test in low-permeability coal seam. Based upon the theory and experience of injection/fall-off test, studies of large amounts of real data and field experiments on the spot were conducted, and finally the feasible measures were presented,which is to reduce the well-bore storage time, prolong testing time and realize third-level well bore configuration in CBM well. The results show that within certain testing time, if radial flow happens during injection/fall-off test in low-permeability coal seam, it must guarantee tinj>3 twb, tfall≥ 2tinj under conditions of ensuring well-bore safety.

关键词

低渗煤层/井筒储集系数/三开井制

Key words

low-permeability coal seam/ wellbore storage coefficient/ third-level well bore configuration

分类

天文与地球科学

引用本文复制引用

杨新辉,李彬刚,李鑫..低渗煤层注入/压降试井注入时间研究[J].煤田地质与勘探,2011,39(2):26-29,4.

煤田地质与勘探

OA北大核心CSCDCSTPCD

1001-1986

访问量0
|
下载量0
段落导航相关论文