煤田地质与勘探2011,Vol.39Issue(2):30-33,4.DOI:10.3969/j.issn.1001-1986.2011.02.007
某矿第四系底部含水层降水井群优化布置
Optimization for dewatering well design in the Quaternary bottom aquifer
王文学 1隋旺华1
作者信息
- 1. 中国矿业大学资源与地球科学学院,江苏,徐州,221008
- 折叠
摘要
Abstract
This paper presents an optimization of multi-well dewatering for the Quaternary bottom aquifer above the panel 6311 in a coal mine based on optimal objective function. The minimum drainage is selected as the target function and groundwater levels at the controlling points as the primary constraint conditions. The calculated safety water head for preventing quicksand is selected as the water level of controlling points, and the optimal objective function is then used to optimize the design. The result indicates that the optimized drainage is reduced by 20% compared with the result calculated with the model of a fully penetrating well in a confined-unconfined aquifer, meeting the same requirement for groundwater levels. The result reveals the pump-output of every dewatering well, that will be helpful for choosing the position and equipment of the dewatering wells.关键词
第四系/疏放水/目标函数法/含水层/优化Key words
Quaternary/ dewatering/ objective function method/ aquifer/ optimization分类
矿业与冶金引用本文复制引用
王文学,隋旺华..某矿第四系底部含水层降水井群优化布置[J].煤田地质与勘探,2011,39(2):30-33,4.