| 注册
首页|期刊导航|水利水电技术|有旁侧入流的交叉工程河段洪水数值模拟

有旁侧入流的交叉工程河段洪水数值模拟

张晓雷 孙东坡 李燕 陈永豪

水利水电技术2011,Vol.42Issue(6):72-74,77,4.
水利水电技术2011,Vol.42Issue(6):72-74,77,4.

有旁侧入流的交叉工程河段洪水数值模拟

Numerical simulation on flood in river section of crossing works with lateral inflow

张晓雷 1孙东坡 1李燕 2陈永豪2

作者信息

  • 1. 华北水利水电学院,河南郑州,450011
  • 2. 河南华禹黄河工程局,河南新乡453003
  • 折叠

摘要

Abstract

The main chanel of the Mid-route of the South-to-North Water Transfer Project crosses Honghe River in Anyang of Henan Province with a crossing works of inverted siphon, where a rapid flow from Wuliu Canal laterally rushed in.The problem of flow discontinuity in the water jumping area of the stilling pool section of Wuliu Canal with a lateral inflow is discussed herein, and then a simplified mode of numerical simulation on the water jumping area within an open channel is put forward.Through establishing a 2-D mathematical model, the river section with the crossing works of Honghe River is numerically simulated and the characteristic of the flood in river section is specially studied as well.The simulation shows that this simplified method is feasible and reliable; which can not only reflect the relation between the conjugate water depth and the energy loss, but can also solve the problem from the simulation on the inflowed lateral torrential flow from Wuliu Chanel therein.

关键词

二维数学模型/河流模拟/间断性/交叉工程/旁侧入流/南水北调中线总干渠

Key words

2-D mathematical model/ river simulation/ discontinuity/ crossing works/ lateral inflow/ main chanel of Mid-route of South-to-North Water Transfer Project

分类

建筑与水利

引用本文复制引用

张晓雷,孙东坡,李燕,陈永豪..有旁侧入流的交叉工程河段洪水数值模拟[J].水利水电技术,2011,42(6):72-74,77,4.

基金项目

水利部公益性行业科研专项经费项目(200901018) (200901018)

国家自然科学基金项目(51079055) (51079055)

华北水利水电学院青年科研基金(HSQJ2009002). (HSQJ2009002)