摘要

Abstract

To effectively exploit coal resources, ascending mining methods can be adopted for a coal mine with three layers. The motion characteristics of 5 -2coal overburden strata after being mined is obtained by the similar simulation experiments and numerical simulation. Combined with ways of “three zones” criterion, ratio method and rock balance method, the article found that caving zone height of 18m is 6 times as the mining height, the fractured zone height of 54m is 18 times as the mining height,the largest floor rock of the 4 -2 coal roof fracture is 10cm, with a crack is closed in the sink basin, concluding that the coal mine 4-2ascending mining is feasible.

关键词

上行开采/相似模拟/上覆岩层

Key words

ascending mining/ resemble simulation/ overlayer strata