Considering different condition adjustment, two stages decomposition-dynamic programming aggregation method was introduced to solve the mathematical model of daily optimal operation for parallel pumping stations which took the minimal daily electric cost of parallel pumping stations as objective function, the flow or speed of each unit as decision variable.Taking minimal daily electric cost of single pump station as objective function, allocation of water quantity pumped by each station as coordinated variable, this model was decomposed into several first stage sub-model of daily optimal operation for single pump station.Then taking minimal daily electric cost of single pump unit as objective function, allocation of water quantity pumped by each unit as coordinated variable, the first stage sub-model was decomposed into several second stage sub-model of daily optimal operation for single pump unit which takes the blade angle or unit speed as decision variable, the discrete value of water quantity pumped by each unit as state variable, and was solved by means of dynamic programming method.The constructed aggregation model took daily water quantity pumped by each pump unit as decision variable, the discrete value of water quantity pumped by parallel station group as state variable, and was also solved by dynamic programming method.This method could solve the optimal operation issues for parallel pumping stations with various operation modes, time period divisions and daily average heads of each station, and also provide theoretical support for the study on optimal operation of multi-stage pumping stations.Taking No.1 ,3 Huaiyin pumping station as a study case, a series of optimization calculations were carried out.The results showed that the unit cost of optimal operation under 100%, 80%, and 60% loads within all average daily heads had an average energy consumption saving of 10.53%, 26.54% and 34.40%, respectively, compared with the operation with fixed blade angle and constant speed.关键词
并联泵站/多机组/叶片全调节/变频变速/二级分解-动态规划聚合法/优化Key words
parallel pumping stations/ multi-units/ adjustable-blade/ variable speed operation with VFD/two stages decomposition-dynamic programming aggregation method/optimization分类
农业科技引用本文复制引用
龚懿,程吉林,张仁田,张礼华..并联泵站群日优化运行方案算法[J].排灌机械工程学报,2011,29(3):230-235,6.基金项目
"十一五"国家科技支撑计划项目(2006BAB04A03) (2006BAB04A03)
国家自然科学基金资助项目(60974099) (60974099)
江苏省2010年度普通高校研究生科研创新计划项目(586) (586)