现代电力2011,Vol.28Issue(2):90-94,5.
百万千瓦机组一次风机RB过程汽温控制策略研究
Study on Steam Temperature Control Strategy in Primary Fan RB Process of 1000 MW Ultra Supercritical Unit
黄卫剑 1陈锐民 1张曦1
作者信息
- 1. 广东电网公司电力科学研究院,广东广州510600
- 折叠
摘要
Abstract
In order to decrease the fluctuation of steam temperature during primary fan RUBACK (RB) process of 1000MW ultra supercritical unit, the influence factors, the excess air coefficient and the ratio of fuel and feed water were studied and analyzed in detail. The control relationship of fuel, feed water and air input during normal operation was discussed and the effective temperature control strategy about these variables during RB process was proposed. Variation results of main steam temperature, reheat steam temperature, unit load and main steam pressure were given. The application results of improving control strategy in Chaozhou power plant show that the proposed strategy is effective for steam temperature and pressure control and is valuable to RB experiments in similar power plant units.关键词
超超临界机组/一次风机/RUNBACK/汽温/控制策略Key words
ultra supercritical unit/ primary air fan/ RUNBACK/ steam temperature/ control strategy分类
信息技术与安全科学引用本文复制引用
黄卫剑,陈锐民,张曦..百万千瓦机组一次风机RB过程汽温控制策略研究[J].现代电力,2011,28(2):90-94,5.