水力发电2011,Vol.37Issue(2):18-23,6.
中国混凝土面板堆石坝的发展
Development of Concrete Faced Rockfill Dam in China
杨泽艳 1周建平 1蒋国澄 2孙永娟1
作者信息
- 1. 中国水电工程顾问集团公司,北京100120
- 2. 中国水利水电科学研究院,北京100048
- 折叠
摘要
Abstract
The Year 2010 is the 25th year of constructing concrete faced rockfill dams in China. After experiencing three development stages of Introduction and Assimilation, Innovation in Our Own Hands and Breakthrough and Development, the noteworthy achievements are gained on CFRDs' design, construction, research and monitor and constructing CFRDs on specific natural conditions. The complete technical standard system and industrial system are also established for the development of CFRDs. The number, maximum height, engineering scale and technology of CFRD has leapt into the front ranks of the world. The construction technology of CFRD is marching to a higher level in China.关键词
混凝土面板堆石坝/发展/阶段/成就/方向Key words
concrete faced rockfill dam/ development/ stage/ achievement/ trend分类
建筑与水利引用本文复制引用
杨泽艳,周建平,蒋国澄,孙永娟..中国混凝土面板堆石坝的发展[J].水力发电,2011,37(2):18-23,6.