玛纳斯河一级水电站引水隧洞的设计与施工
Design and Construction of the Diversion Tunnel for Manas River I Hydropower Station
周吉军1
作者信息
- 1. 新疆生产建设兵团勘测规划设计研究院,新疆石河子832000
- 折叠
摘要
Abstract
Constructing non-pressure tunnel with larger cross section in Quaternary weakly-cemented stratum is rare in China. The diversion tunnel of Manas River I Hydropower Station is constructed in the Quaternary conglomerate (Q1) in Xinjiang. The investigation, design and construction of the tunnel are introduced herein and the experiences can be as references to similar projects.关键词
第四纪地层/隧洞/玛纳斯一级水电站Key words
Quaternary stratum/ tunnel/ Manas River I Hydropower Station分类