长滩河水能梯级开发方案研究

秦守田 臧永顺 崇春莹 洪文彬

水力发电2011,Vol.37Issue(2):43-45,3.
水力发电2011,Vol.37Issue(2):43-45,3.

长滩河水能梯级开发方案研究

Study on the Hydropower Cascade Development of Changtan River

秦守田 1臧永顺 1崇春莹 1洪文彬1

作者信息

  • 1. 中水东北勘测设计研究有限责任公司,吉林长春130021
  • 折叠

摘要

Abstract

After considering the topographic and geological conditions, inundation and resettlement, environmental impact,water resources utilization, investment and economic indicators, the two-cascade development program is proposed for Changtan River, in which, the Gaixiaba Hydropower Station with a installed capacity of 132 MW and the Fanjiaping Hydropower Station with a installed capacity of 12.4 MW are selected as the first and second cascade development, and the total head is 203 m.The Gaixiaba Reservoir with regulating capacity of 181 million m3 has been under construction.

关键词

梯级开发/方案/水电资源开发规划/长滩河

Key words

cascade development/ scheme/ hydropower resource development planning/ Changtan River

分类

建筑与水利

引用本文复制引用

秦守田,臧永顺,崇春莹,洪文彬..长滩河水能梯级开发方案研究[J].水力发电,2011,37(2):43-45,3.

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文