盖下坝水电站工程枢纽布置

陈坤孝 崔忠慧 吕永明 胡志刚 杨玉航 景建伟

水力发电2011,Vol.37Issue(2):46-49,中彩插2-中彩插4,7.
水力发电2011,Vol.37Issue(2):46-49,中彩插2-中彩插4,7.

盖下坝水电站工程枢纽布置

Hydraulic Structures Layout of Gaixiaba Hydropower Station Project

陈坤孝 1崔忠慧 2吕永明 2胡志刚 2杨玉航 2景建伟2

作者信息

  • 1. 重庆云能发电有限公司,重庆404503
  • 2. 中水东北勘测设计研究有限责任公司,吉林长春130021
  • 折叠

摘要

Abstract

The Gaixiaba Hydropower Station is located in the middle reaches of Changtan River, a tributary of Yangtze River in Chongqing. The hydraulic structures consist of the concrete double-curvature arch dam, left-bank diversion tunnel and powerhouse. The maximum height and crest length of the arch dam are 160 m and 153.2 m respectively. A diversion tunnel with a total length of 7.1 km feeds water to three generating units. The ground powerhouse is away from the dam axis of about 7 km.

关键词

水利枢纽/布置/盖下坝水电站

Key words

hydraulic structure/ layout/ Gaixiaba Hydropower Station