水力发电2011,Vol.37Issue(2):46-49,中彩插2-中彩插4,7.
盖下坝水电站工程枢纽布置
Hydraulic Structures Layout of Gaixiaba Hydropower Station Project
陈坤孝 1崔忠慧 2吕永明 2胡志刚 2杨玉航 2景建伟2
作者信息
- 1. 重庆云能发电有限公司,重庆404503
- 2. 中水东北勘测设计研究有限责任公司,吉林长春130021
- 折叠
摘要
Abstract
The Gaixiaba Hydropower Station is located in the middle reaches of Changtan River, a tributary of Yangtze River in Chongqing. The hydraulic structures consist of the concrete double-curvature arch dam, left-bank diversion tunnel and powerhouse. The maximum height and crest length of the arch dam are 160 m and 153.2 m respectively. A diversion tunnel with a total length of 7.1 km feeds water to three generating units. The ground powerhouse is away from the dam axis of about 7 km.关键词
水利枢纽/布置/盖下坝水电站Key words
hydraulic structure/ layout/ Gaixiaba Hydropower Station分类
建筑与水利引用本文复制引用
陈坤孝,崔忠慧,吕永明,胡志刚,杨玉航,景建伟..盖下坝水电站工程枢纽布置[J].水力发电,2011,37(2):46-49,中彩插2-中彩插4,7.