天花板碾压混凝土双曲拱坝温控设计

林健勇 王毅鸣 李贺林 周飞平

水力发电2011,Vol.37Issue(6):47-49,3.
水力发电2011,Vol.37Issue(6):47-49,3.

天花板碾压混凝土双曲拱坝温控设计

Temperature Control Design for the RCC Double-curvature Arch Dam of Tianhuaban Hydropower Station

林健勇 1王毅鸣 1李贺林 1周飞平1

作者信息

  • 1. 中国水电顾问集团北京勘测设计研究院,北京100024
  • 折叠

摘要

Abstract

Because the shape and structure of Tianhuaban Arch Dam is more complex, the river bed is wider, the dam body will bear stronger restraints imposed by the foundation rock masses and dam abutments and the concrete in strong-restrained parts will be poured in hot season, the thermal stress of dam during the period of construction is very significant. By adopting finite element program to simulate the concrete construction process, including layered pouring, placing temperature, lift thickness and others, and considering concrete autogenous volume deformation and creep, the stress and temperature distribution in dam body are calculated. The temperature control principle of pre-embedded water cooling pipe in dam and taking water cooling as key way and others as supplements is determined, and the key positions of temperature control and its corresponding measures are also proposed based on the simulation.

关键词

双曲拱坝/碾压混凝土/温度控制/天花板水电站

Key words

double-curvature arch dam/ RCC/ temperature control/ Tianhuaban Hydropower Station