天花板水电站高温季节大坝碾压混凝土施工质量控制

宗建伦

水力发电2011,Vol.37Issue(6):71-73,90,4.
水力发电2011,Vol.37Issue(6):71-73,90,4.

天花板水电站高温季节大坝碾压混凝土施工质量控制

Construction Quality Control for RCC of Tianhuaban Dam in Hot Season

宗建伦1

作者信息

  • 1. 云南滇能(集团)控股公司昭通工程建设指挥部,云南昭通657000
  • 折叠

摘要

Abstract

The June to October in the area of Tianhuaban Hydropower Station is hot, the quality control for RCC of Tianhuaban Dam is particularly important in this period.By adopting effective control measures from organizational system to technical system, the construction quality of dam is controlled and the concrete quality indicators are all meeting the requirements of design and specifications.There is no unqualified concrete and no cracks in concrete.Testing by reservoir impoundment, the concrete interlayer bonding is good and the internal temperature in concrete is stable at present.

关键词

高温季节/碾压混凝土/质量控制/天花板水电站

Key words

hot season/ RCC/ quality control/ Tianhuaban Hydropower Station

分类

建筑与水利

引用本文复制引用

宗建伦..天花板水电站高温季节大坝碾压混凝土施工质量控制[J].水力发电,2011,37(6):71-73,90,4.

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文