水力发电2011,Vol.37Issue(3):65-68,4.
龙羊峡、刘家峡梯级水库补偿调度节能能力分析
Energy Conservation Capacities of Longyangxia and Liujiaxia Reservoirs on Compensation Scheduling Operation
摘要
Abstract
The energy conservation capacities of Longyangxia and Liujiaxia reservoirs in the upstream reach of Yellow River on the compensation scheduling operation in level years of 2005, 2015 and 2020 and its variations were analyzed respectively by using the Compensation Scheduling Simulation Model of Cascade Reservoirs in Yellow River Mainstream.The results show that, (a) the total energy conservation capacity of Longyangxia and Liujiaxia reservoirs is 7.903 9, 8.090 4 and 6.654 6 million t of Standard Coal in level year 2005, 2015 and 2020 respectively, (b) the variation of total energy conservation capacity has a same law of first increases and then decreases with the energy conservation capacity of Longyangxia Reservoir,and (c) the energy conservation capacity of Liujiaxia Reservoir will gradually decrease.关键词
补偿调度/梯级水库/节能/龙羊峡水电站/刘家峡水电站Key words
compensation scheduling/ cascade reservoir/, energy conservation/ Longyangxia Hydropower Station/ Liujiaxia Hydropower Station分类
建筑与水利引用本文复制引用
张泽中,张亮,齐青青,黄强,薛小杰..龙羊峡、刘家峡梯级水库补偿调度节能能力分析[J].水力发电,2011,37(3):65-68,4.基金项目
国家自然科学基金资助项目(40501011) (40501011)
国家"十一五"水专项基金项目(2008ZX07209-002) (2008ZX07209-002)