核电项目建造阶段中的焊接工艺评定转移

马新朝

电焊机2011,Vol.41Issue(6):13-17,5.
电焊机2011,Vol.41Issue(6):13-17,5.

核电项目建造阶段中的焊接工艺评定转移

Welding procedure qualification transference to different project of nuclear power item during the construction period

马新朝1

作者信息

  • 1. 北京四达贝克斯监理公司(方家山),浙江海盐;314303;中国核电工程有限公司,北京100840
  • 折叠

摘要

Abstract

The paper shows us the Welding producer report transference to different project of nuclear power item during the construction period,analyses the practicability to the producer report transference. After transference,the paper discusses the focal point to welding in construction enterprises,surveillance management corporation as well as the responsible for supervision departments of the Government,give prominence to the Quality assurance and Quality control. The Nuclear Safety Bureau and the Area Departments Responsible for Supervision on radiation should give more attention to the surveillance on transference.The effective transfer of PQR can reduce expenses ,material and manpower in duplicate welding procedure qualification,reduce construction costs ;the other side,which can strongly promotes the project construction,accelerate the welding technology and experience continue development,and improve the management standards.

关键词

核电工程/建造阶段/焊接工艺评定转移/质量控制/监督

Key words

nuclear power project /construction period /welding procedure qualification transference /quality control/surveillance