| 注册
首页|期刊导航|净水技术|青草沙水库原水取水泵站模型试验

青草沙水库原水取水泵站模型试验

严登丰 李彦军 胡德义 佟宏伟 王晓鹏

净水技术2011,Vol.30Issue(3):13-19,7.
净水技术2011,Vol.30Issue(3):13-19,7.

青草沙水库原水取水泵站模型试验

Model Test of Raw Water Intake Pumping Station in Qingcaosha Reservoir

严登丰 1李彦军 1胡德义 2佟宏伟 3王晓鹏3

作者信息

  • 1. 扬州大学,江苏扬州,225009
  • 2. 上海勘测设计研究院,上海,200434
  • 3. 上海青草沙投资建设发展有限公司,上海,201913
  • 折叠

摘要

Abstract

For the Qingcaosha water-supply pumping station in Shanghai city, the hydraulic design of elbow inlet passage and siphon outlet conduit were completed, and the detailed model tests of pump set were selected for hydraulic model. The test system and test rules were illuminated and the detailed test results of the four hydraulic models have been obtained. The test results show that the all conditioning mixed-flow pump model is most appropriate for the pumping station. At the blade angle of -2°,the efficiency of the model pump set is more than 79.5 % at the net lift of 5.8 m, with a very wide operational areas of high efficiency. And the flow of the prototype pump set is 34.6 m3/s. At the net lift of 0 m that is the most adverse operating conditions, the critical NPSH is less than 10 m. So all the performance of the mixed-flow pump can meet the design requirements of the pumping station, and it can operate safely and reliably with high efficiency.

关键词

泵站/模型试验

Key words

pumping station/ model test

分类

建筑与水利

引用本文复制引用

严登丰,李彦军,胡德义,佟宏伟,王晓鹏..青草沙水库原水取水泵站模型试验[J].净水技术,2011,30(3):13-19,7.