| 注册
首页|期刊导航|水利水电技术|乌江彭水水电站导流洞第一标段洞身混凝土施工技术

乌江彭水水电站导流洞第一标段洞身混凝土施工技术

李小红 卯战革 孙洪涛

水利水电技术2009,Vol.40Issue(11):94-98,5.
水利水电技术2009,Vol.40Issue(11):94-98,5.

乌江彭水水电站导流洞第一标段洞身混凝土施工技术

Concrete construction technique for lining of diversion tunnel ( No. 1 tender section) of Pengshui Hydropower Station on Wujiang River

李小红 1卯战革 1孙洪涛1

作者信息

  • 1. 中国水利水电十一工程局有限公司,河南,三门峡,472000
  • 折叠

摘要

Abstract

During the construction of the concrete lining for the diversion tunnel (No. 1 tender section) of Pengshui Hydropower Station on Wujiang River, the reinforcement assembling for large section is realized with a kind of self-made movable trolley for the assembling. Moreover, the technologies of movable full-section and half-section steel formwork carriers and manual formwork erection, etc. are also applied to the construction of formwork for the concrete lining and the concrete lining for the large Ushaped section of the tunnel with quickened construction progress, enhanced construction efficiency, lowered construction cost and higher construction safety, which can be widely popularized to the similar projects concerned.

关键词

导流洞/混凝土衬砌/施工方法/乌江彭水水电站

Key words

diversion tunnel/ concrete lining/ construction technique/ Pengshui Hydropower Station on Wujiang River

分类

建筑与水利

引用本文复制引用

李小红,卯战革,孙洪涛..乌江彭水水电站导流洞第一标段洞身混凝土施工技术[J].水利水电技术,2009,40(11):94-98,5.

水利水电技术

OA北大核心CSCDCSTPCD

1000-0860

访问量0
|
下载量0
段落导航相关论文