水利工程前期工作现状及存在的突出问题

冀建疆 陈建军

水利水电技术2009,Vol.40Issue(11):10-14,5.
水利水电技术2009,Vol.40Issue(11):10-14,5.

水利工程前期工作现状及存在的突出问题

Status and key problems of pre-phase work for water project

冀建疆 1陈建军1

作者信息

  • 1. 水利部,水利水电规划设计总院,北京,100120
  • 折叠

摘要

Abstract

The pre-phase work is the foundation for the construction and management of water project. At present, an unprecedented development of the construction of water project has appeared in China. Though remarkable achievement has been obtained during the pre-phase work of water project, the decrease of the quality of the work is presented therein; for which the causation of the problems and the measures to solve them are discussed herein.

关键词

水利工程/前期工作/水利规划/勘测/设计

Key words

water project/ pre-phase work/ plan/ investigation/ design