水利水电技术2009,Vol.40Issue(11):68-71,79,5.
大口径PCCP生产工艺流程与厂区布置
Technology process and plant layout for production of large diameter PCCP
程翠林 1白家瑞 1刘烨华1
作者信息
- 1. 北京市水利规划设计研究院,北京,100048
- 折叠
摘要
Abstract
The successful production and application of the pre-stressed concrete cylinder pipe with the super-large diameter of 4 m during the construction of the Mid-route of the South-to-North Water Transfer Project are briefly introduced herein in the aspects such as the production technology, plant layout, facilities equipped, production capacity, etc. , which can be taken as the references for the similar projects concerned.关键词
南水北调中线工程/PCCP/生产工艺/布置/生产能力Key words
Mid-route of South-to-North Water Transfer Project/ pre-stressed concrete cylinder pipe/ technology/ layout/ production capacity分类
水利科学引用本文复制引用
程翠林,白家瑞,刘烨华..大口径PCCP生产工艺流程与厂区布置[J].水利水电技术,2009,40(11):68-71,79,5.