Technology process and plant layout for production of large diameter PCCP

程翠林 1白家瑞 1刘烨华1

作者信息

  • 1. 北京市水利规划设计研究院,北京,100048
  • 折叠

摘要

Abstract

The successful production and application of the pre-stressed concrete cylinder pipe with the super-large diameter of 4 m during the construction of the Mid-route of the South-to-North Water Transfer Project are briefly introduced herein in the aspects such as the production technology, plant layout, facilities equipped, production capacity, etc. , which can be taken as the references for the similar projects concerned.

关键词

南水北调中线工程/PCCP/生产工艺/布置/生产能力

Key words

Mid-route of South-to-North Water Transfer Project/ pre-stressed concrete cylinder pipe/ technology/ layout/ production capacity