基于风险度评价和改进蚁群算法的配电网网架规划
Power distribution network planning based on risk assessment and improved ant colony algorithm
李思 1宋珺琤
2沙立成1
作者信息
- 1. 北京市电力公司,北京,100031
- 2. 天津军粮城发电有限公司,天津,300300
- 折叠
摘要
Abstract
An "algorithm of power distribution network flexible planning was proposed based on risk assessment and improved ant colony algorithm. The parameters of object year, such as load, electrovalence, lead price were changed from discrete state to a section of multi-scenario. The uncertainty problem of planning was changed into several confirmed problems. An adaptive ant colony algorithm based on cloud model was presented. The parameters ρ and Q of ant colony algorithm are qualitatively controlled and dynamically selected by employing the uncertain qualitative association rule inference based on cloud modeL The pheromone of branches is adaptive updated according to the process of the algorithm. The adaptive algorithm overcomes the main disadvantage of being inclined to local convergence and slow convergence speed of traditional ant colony algorithm. The adaptive algorithm is applied in confirmed distribution network structure planning. The scheme of each scenario was obtained and the optimum robust planning scheme was made with considering the minimum cost expectation scheme. Then the distribution network flexible planning could be realized. The instance of the paper indicates the method is feasible.关键词
配电网规划/风险度评价/云模型/改进蚁群算法Key words
distribution network planning/ risk assessment/ cloud model/ improved ant colony algorithm分类
信息技术与安全科学引用本文复制引用
李思,宋珺琤
,沙立成..基于风险度评价和改进蚁群算法的配电网网架规划[J].中国电力,2009,42(11):52-56,5.