中国电机工程学报2011,Vol.31Issue(22):8-16,9.
受送电规模限制下水电长期可吸纳电量最大优化调度模型
Long Term Hydropower Optimal Operation Model With Electric Power Transmission Restrictions for Absorbed Energy Maximization
摘要
Abstract
The optimal operations for hydropower systems covering multi provinces and multi basins have become bottlenecks of large scale hydropower system of China. A long term optimal operation model for absorbed energy maximization of hydropower systems was proposed for the hydropower system of China southern power grid (CSG). Based on the energy maximization model, absorbing capacity of power grids and limitation of electric transmission among interconnected power grids were involved in the model to meet the real operation demands of large scale hydropower operations. Progressive optimality algorithm, discrete differential dynamic programming and successive approximation method were combined to solve the model. Case study for a 92 hydropower plants system of CSG shows that the model can satisfy the requirements and confines about long term energy transmission inter provincial power grids, and is suitable for long term hydropower operation problems with large scale inter grids power transmission.关键词
水电/长期/优化调度/可吸纳电量/电力输送Key words
hydropower/long term/optimal operation/consumable energy/electric power transmission分类
信息技术与安全科学引用本文复制引用
武新宇,程春田,王静,唐红兵,李崇浩..受送电规模限制下水电长期可吸纳电量最大优化调度模型[J].中国电机工程学报,2011,31(22):8-16,9.基金项目
国家自然科学基金项目(50979010) ()
国家重点基础研究发展计划项目(973项目)(2009CB226111) ()
国家杰出青年科学基金(51025934). ()