大规模风电接入后的系统调峰充裕性评估

张宏宇 印永华 申洪 何剑 赵珊珊

中国电机工程学报2011,Vol.31Issue(22):26-31,6.
中国电机工程学报2011,Vol.31Issue(22):26-31,6.

大规模风电接入后的系统调峰充裕性评估

Peak-load Regulating Adequacy Evaluation Associated With Large-scale Wind Power Integration

张宏宇 1印永华 1申洪 1何剑 1赵珊珊1

作者信息

  • 1. 中国电力科学研究院,北京市海淀区100192
  • 折叠

摘要

Abstract

Whether large-scale wind power can be integrated into power grid mainly depends on the peak-load regulating capacity. If the peak-load regulating capacity is not enough, the wind power can't be integrated. Therefore, it is important to study the peak-load regulating adequacy in power system. Based on Monte-Carlo simulation method, this paper defined the peak-load regulating requirement continuous curve, and proposed peak-load regulation not enough probability (PRNEP) index and peak-load regulation not enough expectation (PRNEE) index. Considering the unit forced outage rate and random fluctuation of wind power, the proposed indexes effectively reflect the peak-load regulating requirement in power system, which is useful to determine the appropriate wind power integrated scale. The results on IEEE-RTS system with wind farms demonstrate that the proposed method is feasible and effective.

关键词

风电/充裕性评估/调峰/可靠性:调峰不足概率/调峰不足期望

Key words

wind power/adequacy evaluation/peak-load regulation/reliability/peak-load regulation not enough probability (PRNEP)/peak-load regulation not enough expectation (PRNEE)

分类

信息技术与安全科学

引用本文复制引用

张宏宇,印永华,申洪,何剑,赵珊珊..大规模风电接入后的系统调峰充裕性评估[J].中国电机工程学报,2011,31(22):26-31,6.

基金项目

“十一五”国家科技支撑计划重大项目(2008BAA14B01). ()