| 注册
首页|期刊导航|华中科技大学学报:自然科学版|大跨度无碴轨道连续梁桥后期变形控制方法

大跨度无碴轨道连续梁桥后期变形控制方法

侯文崎 叶梅新 曹建安

华中科技大学学报:自然科学版2011,Vol.39Issue(7):109-112,127,5.
华中科技大学学报:自然科学版2011,Vol.39Issue(7):109-112,127,5.

大跨度无碴轨道连续梁桥后期变形控制方法

Control method for long term-deformations of long-span continuous bridges with bailastless tracks

侯文崎 1叶梅新 1曹建安1

作者信息

  • 1. 中南大学土木建筑学院,湖南长沙410075
  • 折叠

摘要

Abstract

Long term-deformation of pre-stressed concrete continuous girders affect the smoothness of non-ballast tracks. Taking an example, a newly-built high speed railway long-span pre-stressed concrete continuous rigid frame bridge with ballastless track was studied, and the effects of different methods on the later-stage deformation control were compared through FEA (finie element analysis). Then, a set of coordinate control measures was put forward. Results show that extending track laying time, reserving post-tensioned cables and tensioning external tendons are all effective in decreasing the later-stage deformation of the bridges. Track laying time is appropriate to be delayed for about 0.5 a, post-tensioned cables and external tendons can be tensioned in sequence according to practical deform- ation of bridges. When the coordinate control measures were used, the example bridge's 20 a deformation after the track laying was controlled within 21.9 mm for the middle span and 12.8 mm for the side span, which was far less than the deformation limitation.

关键词

无碴轨道/后期变形/变形控制/预应力混凝土连续粱桥/体外索/后张钢柬

Key words

ballastless track/long term-deformation/deformation control/pre-stressed concrete con-tinuous bridge/external tendons/post-tensioned cables

分类

交通工程

引用本文复制引用

侯文崎,叶梅新,曹建安..大跨度无碴轨道连续梁桥后期变形控制方法[J].华中科技大学学报:自然科学版,2011,39(7):109-112,127,5.

基金项目

铁道部科技研究开发计划资助项目(2006G009-C-2). ()

华中科技大学学报:自然科学版

OA北大核心CSCDCSTPCD

1671-4512

访问量0
|
下载量0
段落导航相关论文