兰新高速铁路戈壁碎石土地基处理方法试验研究

赵彦旭

路基工程Issue(4):166-168,3.
路基工程Issue(4):166-168,3.

兰新高速铁路戈壁碎石土地基处理方法试验研究

Experimental Analysis on Gravel Soil Foundation Treatment in Gobi Area of Lanzhou-Xinjiang High-speed Railway

赵彦旭1

作者信息

  • 1. 中铁二十一局集团公司,兰州730000
  • 折叠

摘要

Abstract

The second double-line roadbed accounts for a large proportion in Lanzhou-Xinjiang High-speed Railway,which is the longest high-grade railway bed in China at present.There is almost Gobi desert along the line and the roadbed is almost gravel soil.This line adopts ballastless track,which has very strict requirement on compactness control and post-construction settlement.However,there is no special specification for railway at present.Based on the treatment technology of gravel soil foundation and the monitoring data,the effect of hammering compaction,impact rolling and heavy rolling are compared and their reinforcement mechanism are separately analyzed.The results show that these three methods can all satisfy design requirement for reinforcement of gravel soil foundation in Gobi area.But through comprehensive comparison,heavy rolling can achieve the best effect,which is preferred for treatment.

关键词

高速铁路/戈壁/碎石土/地基处理/试验

Key words

high-speed railway/Gobi/gravel soil/foundation treatment/test

分类

交通工程

引用本文复制引用

赵彦旭..兰新高速铁路戈壁碎石土地基处理方法试验研究[J].路基工程,2011,(4):166-168,3.

路基工程

1003-8825

访问量0
|
下载量0
段落导航相关论文