| 注册
首页|期刊导航|水利水电技术|大型调水工程两部制水价优化模型

大型调水工程两部制水价优化模型

孔珂 苗淑娟 金丽 李庆国

水利水电技术2011,Vol.42Issue(7):71-74,4.
水利水电技术2011,Vol.42Issue(7):71-74,4.

大型调水工程两部制水价优化模型

Optimization model of two-part water price for large water transfer project

孔珂 1苗淑娟 1金丽 2李庆国1

作者信息

  • 1. 济南大学,资源与环境学院,山东,济南,250002
  • 2. 山东省水利科学研究院,山东,济南,250013
  • 折叠

摘要

Abstract

Under the framework of the present national water price policy, the special form of the two-part water price is determined according to the certain conditions of the Jiaodong Water Transfer Project; for which a long-term optimal model of the twopart water price is established based on the comprehensive consideration of the economic security of the water transfer project, the benefit of the water consumption area, the uncertainty of water supply and demand and the bearing capacity of the water price.With the modified Big-M method and the Mixed Integer Planning technique, the model is converted to the calculable form, and then a water price scheme is worked out by taking Wehai as an actual case; which, on the whole, can provide some references of the decision-making of water price for the other similar large water transfer projects in China.

关键词

两部制水价/调水工程/优化模型/大M法/混合整数规划

Key words

two-part water price/ water transfer project/ optimization model/ Big-M method/ Mixed Integer Planning

分类

管理科学

引用本文复制引用

孔珂,苗淑娟,金丽,李庆国..大型调水工程两部制水价优化模型[J].水利水电技术,2011,42(7):71-74,4.

基金项目

国家"十一五"重大科技支撑项目(2008ZX07422001) (2008ZX07422001)

济南大学博士基金(XBS0701). (XBS0701)

水利水电技术

OA北大核心CSCDCSTPCD

1000-0860

访问量0
|
下载量0
段落导航相关论文