西北地质2011,Vol.44Issue(3):95-99,5.
舟曲三眼峪泥石流监测预警方案设计
The Design for Zhouqu Sanyanyu Debris Flow Monitoring and Early Warning System
摘要
Abstract
The mitigation for debris flow not only needs engineering measurements, but also needs monitoring and early warning system, to obtain the goal of risk-reducing effectively. This paper took Zhouqu Sanyanyu debris flow as a studying case, proposed a comprehensive monitoring and early warning system, designed the rainfall monitoring sub-system for the debris flow triggering factors; the infrasound, mud level, ultra red-ray interruption, and video monitoring sub-system for the debris flow occurring and moving; the landslide monitoring sub-system for the debris flow resources; and the dam strain and stress monitoring sub-system for the debris flow engineering count measurements- Finally build up the early warning information system for the whole debris flow.关键词
舟曲"8.8"特大泥石流/三眼峪/监测预警Key words
Zhouqu "8. 8" extremely large debris flow/Sanyanyu/ monitoring and early warning分类
天文与地球科学引用本文复制引用
唐亚明,张茂省,魏新平,毕远宏,丛凯..舟曲三眼峪泥石流监测预警方案设计[J].西北地质,2011,44(3):95-99,5.基金项目
国土资源大调查计划项目"西北黄土高原区地质灾害详细调查"(1212010640330) (1212010640330)
地调项目"延安宝塔区地质灾害监侧预警示范"(编号1212010740907),地调项目"西北黄土高原区地质灾害综合研究"(编号1212010914039). (编号1212010740907)