西北地质2011,Vol.44Issue(3):115-121,7.
对三眼峪泥石流以往防治措施的反思
Post-Thinking of the Former Mitigation Measures for the Sanyanyu Debris Flow
摘要
Abstract
The extra large debris flow in Zhouqu county on August 8, 2010 caused serious disaster which causing widespread concern of domestic and international engineering geological community. The investigation after disaster found that the former prevention and control projects were completely destroyed and the protection ability was breakdown. We should rethink it in order to learn this painful lesson. Based on the field investigation, through the discrete element simulation and theoretical analysis, the paper obtains some conclusions, such as the block dams are not strong enough against the stamping force of debris flow, the flow of the drainage projects does not match the cross-section, the flood discharge capacity is serious insufficient, there are too much curved conduits and the curvature is too big. Consideration and awareness of these issues will provide reference for the treatment scheme after the disaster.关键词
拦挡坝强度/排导沟挤占/防治工程失效/行洪能力/三眼峪泥石流Key words
strength of gravity dam/ occupation of drainage ditch/ invalidation of prevention and treatment projects/ flood discharge capacity/ Sanyanyu debris flow分类
天文与地球科学引用本文复制引用
王根龙,张茂省,赵成,胡向德,于国强,曾庆铭..对三眼峪泥石流以往防治措施的反思[J].西北地质,2011,44(3):115-121,7.基金项目
国土资源大调查计划项目"西北黄土高原区地质灾害详细调查"(1212010640330),中国博士后科学基金(20090450565),国家自然科学基金项目(40872208) (1212010640330)