中国电力2011,Vol.44Issue(8):14-18,5.
一种最大化系统风险收益的检修模型
A new maintenance model with maximized system risk premium
周志勇 1韩本帅 1崔海鹏 1张斌 2束娜 1张涛 1张航1
作者信息
- 1. 山东电力工程咨询院有限公司,山东济南250013
- 2. 华能济南黄台发电有限公司,山东济南250100
- 折叠
摘要
Abstract
With the increasing of equipment degradation and economy importance, the contradiction between the maintenance resources shortage and the demand of system reliability is emerged. The reliability-centered maintenance (RCM) provides the possible solution. Based on the existing research results, a new RCM based maintenance model is proposed. The concept of system risk premium is defined. The maintenance process is divided into two stages, then the corresponding system risk is quantified. The objective of die model is to maximize the summation of system risk premium in both stages. The model can quantitatively analyze the impact of the maintenance to the power system reliability and achieve maximum maintenance benefits. The result shows the effectiveness of the proposed model.关键词
电力系统/状态检修/系统风险/风险收益Key words
power system/ reliability-centered maintenance/ power system risk/ risk premium分类
信息技术与安全科学引用本文复制引用
周志勇,韩本帅,崔海鹏,张斌,束娜,张涛,张航..一种最大化系统风险收益的检修模型[J].中国电力,2011,44(8):14-18,5.