穿越浅埋偏压长大不稳定斜坡体进洞施工技术

Technology of the Entrance Excavation of a Shallow and Uneven Pressured Tunnel through a Long and Unstable Slope

梁伟1

作者信息

  • 1. 中铁十一局集团一公司,湖北襄樊441104
  • 折叠

摘要

Abstract

The entrance of Meiziao tunnel on Xiang-Gui railway passes through a long, unstable slope with shallow cover. Through the construction option comparison and security identification, it was detemined to excavate firstly the surface layer of the slope body and to reinforce the surface by wire-meshed shotcreting. On the section of main tunnel the ground was consolidated by grouting through steel tubes, changing the physico-chemical structure of soils and surrounding rocks, enhacing their strength and integrity. Main tunnel excavation adopted long pipe-roofing and CRD method (I. E. Overlapped intermediate walls method) , further reducing the disturbance to the surrounding rocks in the construction process, thereupon the excavation through the long, unstbale, uneven-pressured and shallow slope was smoothly completed.

关键词

浅埋偏压隧道/铁路隧道/不稳定斜坡体/锚网喷防护/钢化管注浆/施工

Key words

Shallow and uneven-pressured tunnel/ Railway tunnel/ Unstable slope body/ Wire-meshed shotcret protection/ Steel tube grouting/ Construction