水力发电2011,Vol.37Issue(7):44-46,3.
突变级数评价法在南水北调工程施工方案优选中的应用
Application of Catastrophe Progression Method to Optimize the Construction Scheme of South-to-North Water Diversion
孙波 1李燕楠 2王长春1
作者信息
- 1. 中国人民武装警察部队水电第一总队第一支队,河北唐山063004
- 2. 桂林理工大学,广西桂林541004
- 折叠
摘要
Abstract
After considering the construction characteristics of the Middle Route of South-to-North Water Diversion, the catastrophe progression method based on catastrophe theory is proposed to optimize the construction schemes. For the application of the method, the multi-layer assessment objectives are firstly analyzed, and then, the ultimate catastrophe function is obtained through different catastrophe models to calculate and integrate data, and finally, the total value of mutation is obtained. The case study shows that the method is reasonable and can avoid the subjectivity on determine the weight of factors.关键词
突变级数评价法/施工方案/南水北调中线工程Key words
catastrophe progression method/ construction scheme/ the Middle Route of South-to-North Water Diversion分类
建筑与水利引用本文复制引用
孙波,李燕楠,王长春..突变级数评价法在南水北调工程施工方案优选中的应用[J].水力发电,2011,37(7):44-46,3.