Abstract
The concrete in the invert of circular pressured sections of the spillway tunnel in Nuozhadu Hydropower Station was placed by using slipform. Following the requirements of construction specifications and managing strictly the construction according to construction program and quality standards, the construction period is shorten on the basis of guarantying the quality. The construction also provides a good basis for the concrete placement of other parts of tunnel, and achieves good economic and social benefits.关键词
泄洪洞/底拱/滑模/糯扎渡水电站Key words
spillway tunnel/ invert/ slipform/ Nuozhadu Hydropower Station分类
建筑与水利引用本文复制引用
张尹耀,李文瑛,宋希宁..糯扎渡水电站泄洪洞底拱混凝土滑模施工技术[J].水力发电,2011,37(7):47-49,3.