| 注册
首页|期刊导航|大庆石油地质与开发|二类油层聚合物驱压裂时机的确定

二类油层聚合物驱压裂时机的确定

佟胜强

大庆石油地质与开发2011,Vol.30Issue(4):131-134,4.
大庆石油地质与开发2011,Vol.30Issue(4):131-134,4.DOI:10.3969/J.ISSN.1000-3754.2011.04.031

二类油层聚合物驱压裂时机的确定

TIMING OF THE FRACTURING OF POLYMER FLOODED TYPE- H OIL RESERVOIRS

佟胜强1

作者信息

  • 1. 大庆油田有限责任公司第一采油厂,黑龙江大庆163001
  • 折叠

摘要

Abstract

In order to find the perfect timing for the fracturing of polymer flooding in type Ⅱ reservoir so as to reach the greatest increase in recovery factor, cluster analysis and multi-factor deviation analysis combined with single factor variable are applied, and statistics on fracturing effect of type Ⅱ reservoir is done. The best fracturing timing for different production wells during polymer flooding in type Ⅱ reservoir has been obtained. The result shows that for well-connected and well-developed production wells, the best timing for fracturing is the stable water cut period when the water cut is below 80% ; for well-connected and poor-developed wells, the best timing is the stable water cut period when the water cut is below 85% ; for poor-connected and well-developed wells, the best timing is . When the water cut is below 80% and injection intensity is over 10 m3/ (m ? D) ; for poor-connected and poor-developed wells, the best timing is when the water cut is below 85% and injection intensity is over 10 m3/ ( m ? D).

关键词

二类油层/聚合物驱/统计分析/措施优化

Key words

type-Ⅱ reservoir/ polymer flooding/ statistical analysis/ measurement optimization

分类

社会科学

引用本文复制引用

佟胜强..二类油层聚合物驱压裂时机的确定[J].大庆石油地质与开发,2011,30(4):131-134,4.

大庆石油地质与开发

OA北大核心CSCDCSTPCD

1000-3754

访问量0
|
下载量0
段落导航相关论文