| 注册
首页|期刊导航|工矿自动化|煤矿井下双回路供电系统运行方式的革新与优化

煤矿井下双回路供电系统运行方式的革新与优化

李福

工矿自动化2011,Vol.37Issue(7):24-26,3.
工矿自动化2011,Vol.37Issue(7):24-26,3.DOI:CNKI:32-1627/TP.20110628.1409.007

煤矿井下双回路供电系统运行方式的革新与优化

Renovation and Optimization of Operation Mode of Dual-circuit Power Supply System in Coal Mine

李福1

作者信息

  • 1. 大同煤矿集团有限责任公司机电管理处,山西大同037003
  • 折叠

摘要

Abstract

For the problem that most dual-circuit power supply systems in coal mine underground could not accord with requirements of version 2009 of Coal Mine Safety Regulations, the paper presented a way of renovation and optimization of operation mode of dual-circuit power supply system, and pointed out that dual-circuit power supply system which uses parallel operation mode still has a problem of uneasy switchover caused by electric resetting and the problem should be further researched.

关键词

矿井;双回路供电;运行方式;并列运行;分列运行

Key words

mine/ dual-circuit power supply/ operation mode/ parallel operation/ independent operation

分类

矿业与冶金

引用本文复制引用

李福..煤矿井下双回路供电系统运行方式的革新与优化[J].工矿自动化,2011,37(7):24-26,3.

工矿自动化

OA北大核心CSTPCD

1671-251X

访问量0
|
下载量0
段落导航相关论文