三峡枢纽水库运行调度

张曙光 周曼

中国工程科学2011,Vol.13Issue(7):61-65,5.
中国工程科学2011,Vol.13Issue(7):61-65,5.

三峡枢纽水库运行调度

Operation and regulation of Three Gorges Reservoir

张曙光 1周曼1

作者信息

  • 1. 中国长江三峡集团公司,湖北宜昌443002
  • 折叠

摘要

Abstract

Since the impoundment of Three Gorges Reservoir in 2003, the construction schedule, resettlement and geological hazard treatment were ahead of those in the preliminary design. The sedimentation conditionswere obviously better than expected, and the goal of stage - by - stage impoundment was achieved in advance. Simultaneously , with the changes in operating conditions, optimum operations such as floating control of flood limit water level, medium and small flood regulation and impounding in advance were carried out, which produced enormous comprehensive benefits in flood control, drought relief, navigation, water supply and ecology. Especially during the flood season in 2010, the flood retention and storage capacity reached totaled 26.6 billion m3 through medium and small sized flood regulation, and the flood resources were fully utilized. In the end of the flood season, the flood resources were fully utilized and the water lever reached 175 m first with the joint operation of flood control and water storage. Then the project began to give full play to its comprehensive benefits during the normal operation period.

关键词

运行调度/三峡枢纽

Key words

operation and regulation/ Three Gorges Project

分类

建筑与水利

引用本文复制引用

张曙光,周曼..三峡枢纽水库运行调度[J].中国工程科学,2011,13(7):61-65,5.

中国工程科学

OA北大核心CSTPCD

1009-1742

访问量0
|
下载量0
段落导航相关论文