| 注册
首页|期刊导航|重庆理工大学学报(自然科学版)|自动化集成电镀生产线的生产调度问题

自动化集成电镀生产线的生产调度问题

田志锋 尚宏利 姚威

重庆理工大学学报(自然科学版)2011,Vol.25Issue(6):38-44,7.
重庆理工大学学报(自然科学版)2011,Vol.25Issue(6):38-44,7.

自动化集成电镀生产线的生产调度问题

Schedule Problem for Automatic Integrated Electroplated Product Lines

田志锋 1尚宏利 2姚威1

作者信息

  • 1. 重庆大学机械传动国家重点实验室,重庆400044
  • 2. 重庆理工大学化学化工学院,重庆400054
  • 折叠

摘要

Abstract

This paper aimed at finding a permutation of jobs for electroplated product lines' scheduling problem with the objective of minimizing makespan. Virtual station was used to transform the problem to Zero Waiting Flow Shop Schedule problem. The dispatching mechanism of electroplated product lines was discussed in detail. A mathematical model was built on analysis of the dual resource constrained problem. A mixed algorithm that combined genetic algorithm with simulated annealing algorithm for a Flow Shop scheduling problem was proposed. The simulation result shows that the approach is feasible and provides a good practical way for the electroplated product lines' scheduling problem.

关键词

电镀生产线/生产调度/遗传算法/模拟退火

Key words

electroplated product lines/flow shop/genetic algorithm/simulated annealing

分类

信息技术与安全科学

引用本文复制引用

田志锋,尚宏利,姚威..自动化集成电镀生产线的生产调度问题[J].重庆理工大学学报(自然科学版),2011,25(6):38-44,7.

基金项目

国家自然科学基金资助项目(50775226) (50775226)

重庆理工大学学报(自然科学版)

OACSTPCD

1674-8425

访问量0
|
下载量0
段落导航相关论文