电力系统保护与控制2011,Vol.39Issue(17):12-16,5.
中性点非有效接地系统单相接地故障暂态零模电流获取方法研究
Study of transient zero-module current measurement of single-phase earth fault in neutral non-effective grounding system
摘要
Abstract
A new method using magnetic field induction to measure transient zero-module current of single phase earth fault in neutral non-effective grounding system overhead lines is proposed. The paper analyses the characteristics of magnetic field around the overhead lines in detail, and the results show that the relationship of magnetic field under overhead lines and the transient zero-module current is linear, so transient zero-module current can be measured by inducting the magnetic field. Using a Hall probe magnetometer to induct magnetic field for fault transient current measurements is proposed, and some key techniques of practical application are expatiated. Simulation and experimental tests verify the correctness and feasibility of the proposed method.关键词
小电流接地系统/单相接地故障/磁场/零模电流/暂态Key words
neutral non-effective grounding system/ single-phase earth fault/ magnetic field/ zero-module current/ transient分类
信息技术与安全科学引用本文复制引用
季涛,孙波,苑倩倩..中性点非有效接地系统单相接地故障暂态零模电流获取方法研究[J].电力系统保护与控制,2011,39(17):12-16,5.基金项目
山东省自然科学基金资助项目(ZR2009FM054) (ZR2009FM054)