首页|期刊导航|电力系统保护与控制|黑启动恢复中网架重构阶段的负荷恢复优化

黑启动恢复中网架重构阶段的负荷恢复优化

钟慧荣 顾雪平 朱玲欣

电力系统保护与控制2011,Vol.39Issue(17):26-32,7.
电力系统保护与控制2011,Vol.39Issue(17):26-32,7.

黑启动恢复中网架重构阶段的负荷恢复优化

Optimization of load restoration during network reconfiguring process of black-start restoration

钟慧荣 1顾雪平 1朱玲欣2

作者信息

  • 1. 华北电力大学电气与电子工程学院,河北保定071003
  • 2. 河北农业大学理学院,河北保定071001
  • 折叠

摘要

Abstract

Based on the characteristics that network structure changes constantly during network reconfiguration, the mutual influence of units start-up and load restoration is intensively studied. An optimization method for load restoration during network reconfiguration is proposed by a comprehensive consideration of load recovery cost, load characteristics, load importance and the influence of the load restoration on the succeeding network reconstruction. The restoring process is carried out step by step based on a fixed time interval. In this method, first, the loads which satisfied restoration are selected according to the system's previous restoration state, then, their comprehensive weights are calculated by analytical hierarchy process method, finally, the loads restored in this time step are determined by using the greedy algorithm. The application results on the IEEE-30 bus system show that the loads which are more important and favorable to the succeeding network reconstruction can be effectively picked out for restoration by the proposed optimization method.

关键词

黑启动恢复/网架重构/负荷恢复优化/层次分析法/贪婪算法

Key words

black-start restoration/ network reconfiguration/ load restoration optimization/ analytical hierarchy process/ greedy algorithms

分类

信息技术与安全科学

引用本文复制引用

钟慧荣,顾雪平,朱玲欣..黑启动恢复中网架重构阶段的负荷恢复优化[J].电力系统保护与控制,2011,39(17):26-32,7.

基金项目

河北省自然科学基金项目资助(E2011502025) (E2011502025)

电力系统保护与控制

OA北大核心CSCDCSTPCD

1674-3415

访问量0
|
下载量0
段落导航相关论文