基于GO法的高速铁路牵引变电所可靠性评估

陈民武

电力系统保护与控制2011,Vol.39Issue(18):56-61,6.
电力系统保护与控制2011,Vol.39Issue(18):56-61,6.

基于GO法的高速铁路牵引变电所可靠性评估

The reliability assessment of traction substation of high speed railway by the GO methodology

陈民武1

作者信息

  • 1. 中铁第一勘察设计院集团有限公司电气化处,陕西西安710043;西南交通大学电气工程学院,四川成都610031
  • 折叠

摘要

Abstract

In order to assure the uninterrupted power supply of high speed railway, the reliability assessment of traction substation is essential at the design stage. A new system reliability analysis method, called the GO methodology, is applied in the reliability assessment of traction substation of high speed railway. Considering the maintainability and shutdown correlation of electrical equipments in substation, the simplified GO diagram is obtained by taking the uninterrupted power supply as its target. Then, the quantitative and qualitative assessment of reliability is realized, the weakness of system is found and the sum of probabilities of minimal cut sets can be calculated as the upper limit of substation failure probability, which can be used for the reliability design of traction power supply system of high speed railway.

关键词

高速铁路/牵引变电所/GO法/可靠性评估/定量计算/定性计算

Key words

high speed railway/ traction substation/ GO methodology/ reliability assessment/ quantitative calculation/ qualitative calculation

分类

信息技术与安全科学

引用本文复制引用

陈民武..基于GO法的高速铁路牵引变电所可靠性评估[J].电力系统保护与控制,2011,39(18):56-61,6.

基金项目

“十一五”国家科技支撑计划(2007BAA12B05) (2007BAA12B05)

电力系统保护与控制

OA北大核心CSCDCSTPCD

1674-3415

访问量4
|
下载量0
段落导航相关论文