港工技术2011,Vol.48Issue(4):21-24,4.
烟台港西港区防波堤结构方案比选
Comparison and Selection of Marine Structure Plan for Breakwater in West Port Area of Yantai Port
李秀英 1杨文斌2
作者信息
- 1. 中交第四航务工程勘察设计院有限公司,广东广州510230
- 2. 中交第一航务工程勘察设计院有限公司,天津300222
- 折叠
摘要
Abstract
West Port Area breakwater project of Yantai Port is located in the sea area where deep water level and strong wave exist, the bearing capacity of natural foundation is worse. As for breakwater design, through comprehensive comparison among traditional riprap slope type, compound vertical type, cylindrical caisson vertical type and large cylinder vertical type breakwaters, the economic and reasonable breakwater design plan that suits the project is determined.关键词
爆破挤淤/斜坡堤:箱筒结构/复合直立式/大圆筒结构Key words
blasting compaction/ slope embankment/ cylindrical caisson structure/ compound vertical type/ large cylinder structure分类