Discussion on Track Connecting Option of Newly-built Railway from Liaoyuan to Changchun

胡研 1刘艳新1

作者信息

  • 1. 吉林铁道勘察设计院有限公司,吉林 132001
  • 折叠

摘要

Abstract

This article comprehensively studies and elaborates the newly-built railway from Liaoyuan to Changchun in terms of feasibility and rationality, from the aspects of project function and orientation, main technical standards, traffic composition and so on, then according to the project investment, construction difficulties, transport organization, puts forward recommendation that the railway will be starting from Shuangyang station on Changshuangyan railway leading from Changchun railway terminal, the ending station will be Baiquan station in the Liaoyuan railway area.

关键词

新建铁路/辽源至长春铁路/接轨方案

Key words

Newly-built/ Liaoyuan-Changchun railway/ Track connecting option

分类

交通工程

引用本文复制引用

胡研,刘艳新..新建辽源至长春铁路接轨方案论述[J].铁道标准设计,2011,(10):37-40,4.

铁道标准设计

OA北大核心CSTPCD

1004-2954

访问量0
|
下载量0
段落导航相关论文