| 注册
首页|期刊导航|铁道标准设计|高速铁路接触网电分相设计

高速铁路接触网电分相设计

范海江 张曼华 侯震宇

铁道标准设计Issue(9):99-101,3.
铁道标准设计Issue(9):99-101,3.

高速铁路接触网电分相设计

Design of OCS Phase Segragation for High Speed Railways

范海江 1张曼华 1侯震宇1

作者信息

  • 1. 铁道第三勘察设计院集团有限公司,天津300251
  • 折叠

摘要

Abstract

By analysing the relative positions of EMU pantograph and air-insulated phase segregation, this paper discusses the applicability of the air-insulated phase segragation for high speed railways. Through comparison among different styles, it is recommended that the style of phase segragation should be decided by the speed of operating: six-span air-insulated overlap section is proper for the section operating below 200 km/h; twelve(or thirteen)-span air-insulated overlap section is proper for the section of high speed main lines.

关键词

高速铁路/接触网/受电弓/电分相/锚段关节

Key words

Pantograph/ Phase segragation/ Overlap section

分类

交通运输

引用本文复制引用

范海江,张曼华,侯震宇..高速铁路接触网电分相设计[J].铁道标准设计,2011,(9):99-101,3.

铁道标准设计

OA北大核心CSTPCD

1004-2954

访问量3
|
下载量0
段落导航相关论文