斜拉桥桥塔钢—混凝土结合段模型试验研究

司秀勇 肖林 赵建波

中国铁道科学2011,Vol.32Issue(5):26-31,6.
中国铁道科学2011,Vol.32Issue(5):26-31,6.

斜拉桥桥塔钢—混凝土结合段模型试验研究

Model Test Research on the Steel-Concrete Joint Section of Cable Stayed Bridge Tower

司秀勇 1肖林 2赵建波1

作者信息

  • 1. 燕山大学建筑工程与力学学院,河北秦皇岛066004
  • 2. 西南交通大学土木工程学院,四川成都610031
  • 折叠

摘要

Abstract

Based on the similarity principle of geometry, physics and boundary conditions, a reduced scale test model of the steel-concrete joint section of the No. 1 bridge tower in the new south district in Mianyang was designed. The test model was loaded according to the serviceability limit state and ultimate limit state separately, and the variations of stress and deformation of the control sections and main members with loading history were obtained. As shown in the results, the stress of the steel structure, the concrete structure and the steel reinforcement of PBL shear connector in the joint section is lower. The relative slip between steel box and concrete is smaller. The steel box and concrete work together well, and the load from the steel structure is smoothly delivered to the concrete structure. It indicates that the joint section of the bridge is reasonably designed. It has enough emergency capacity and meets safety requirements.

关键词

斜拉桥/桥塔/钢—混凝土结合段/PBL键/模型试验

Key words

Cable stayed bridge/ Bridge tower/ Steel-concrete joint section/ PBL shear connector/ Model test