The left slope of Jinping I Hydropower Station is high and steep and the geological conditions are complex. During the excavation of slope, the shallow and deep supporting was jointly adopted and a large amount of prestressed anchor cables were arranged. For verifying the design parameters, optimizing the construction process and speeding up the construction schedule, the destructive test (stress performance tests) of anchor cable are conducted in field. The tests show that the used material and structure of anchor cable meets safety requirements.

关键词

高边坡:预应力锚索/破坏性试验/锦屏一级水电站

Key words

high slope/ prestressed anchor cable/ destructive test/ Jinping I Hydropower Station