基于改进粒子群优化算法的施工期拱坝结构性态反演分析

李占超 侯会静

水利水电科技进展2011,Vol.31Issue(4):24-28,5.
水利水电科技进展2011,Vol.31Issue(4):24-28,5.DOI:10.3880/j.issn.1006-7647.2011.04.005

基于改进粒子群优化算法的施工期拱坝结构性态反演分析

Inverse analysis of structural behaviors of arch darns during construction period based on improved partiche swarm optimizatinon

李占超 1侯会静2

作者信息

  • 1. 河海大学水文水资源与水利工程科学国家重点实验室,江苏南京210098
  • 2. 河海大学水资源高效利用与工程安全国家工程研究中心,江苏南京210098
  • 折叠

摘要

Abstract

For their deformation characteristics, a special safety monitoring model for arch dams during the construction period was established. Trie hydraulic component of the dam deformation was extracted. The improved particle swarm optimization method was employed to optimize and calculate the optimal control model for inversion problems of arch dams. Accordingly, the inverse analysis of structural behaviors of arch dams during the construction period would be performed. An arch dam was taken as an example to inverse its structural behaviors during the construction period. The results show that the relative errors of the inversed dam deformation are all less than 2%, and the feasibility of the proposed method is validated.

关键词

拱坝/坝体变形/反演分析/改进粒子群算法/坝体施工期/大坝安全监控模型

Key words

arch dam/dam deformation/inverse analysis/improved particle swarm optimization/construction period of dam/dam safety monitoring model

分类

建筑与水利

引用本文复制引用

李占超,侯会静..基于改进粒子群优化算法的施工期拱坝结构性态反演分析[J].水利水电科技进展,2011,31(4):24-28,5.

基金项目

国家自然科学基金(51079046) (51079046)

河海大学水文水资源与水利工程科学国家重点实验室专项基金(2009586012,2010585212) (2009586012,2010585212)

江苏省普通高校研究生科研创新计划(CX09B_163Z) (CX09B_163Z)